Our systems are delivered with professional site supervision and technical oversight, available throughout the entire EU.
In most cases, the material for the construction of the fence is transported before assembly by contracted freight transport, when we look for the most favorable price of the "excavator". The customer is required to ensure unloading. The fence can be unloaded both with a forklift and by hand, as the individual elements are packed in such a way that they can be handled by hand. The installers will then be transported separately, including tools and small assembly material, to the agreed assembly date.
0 items